To be honest, the winch business looks old-school from the outside—steel, grooves, grease. But step into a modern factory in Qiaoxi district, Shijiazhuang, and you’ll see sensors, CNC grooves, and test rigs humming away. The flagship here is the Steel Wire Rope Automatic Rope Arrangement Drum Hydraulic Winch For Offshore Platforms, built at NO.688 Zhongshan Road. It’s the kind of tool that either saves you rope and downtime—or eats both for breakfast.
Offshore operators keep asking for three things: predictable spooling, corrosion resistance, and verified duty cycles. The “double folded wire rope groove” (often called double-line/Lebus-type) remains hot because it holds multilayer spooling without crushing lower wraps. Surprisingly, many customers say this alone extended rope life a full season.
Model: Steel Wire Rope Automatic Rope Arrangement Drum Hydraulic Winch For Offshore Platforms. FOB: US $0.5–9,999 per piece; MOQ 100; capacity ≈ 10,000 pcs/month.
| Parameter | Typical Value (≈) | Notes |
|---|---|---|
| Drum Material | Q355 / 42CrMo | Selection by duty class |
| Groove Type | Double-line multilayer | Reduced crossovers, better layer control |
| Drive | Hydraulic | Closed-loop options |
| Rope Ø | 12–64 mm | Custom pitch/groove angle |
| Rated Line Pull | 50–300 kN | Static test at 1.25–1.5× |
| Line Speed | 0.2–1.2 m/s | Load-dependent |
| Coating | Zinc-rich + PU top | 500–1,000 h salt spray |
Use cases: offshore lifting appliances, deck mooring, AHC winches, ROV LARS, pipe handling. Many clients report rope damage down by ≈25–40% after switching to the double-line groove with automatic rope arrangement. One maintenance chief told me, “We finally stopped babysitting the first wrap.”
| Vendor | Core strength | Certs (typ.) | Lead time | Customization | Price index |
|---|---|---|---|---|---|
| Winch Drum Manufacturer | Double-line groove, auto rope arrangement | ISO/EN, DNV/ABS-ready | 6–10 wks | High (pitch, coatings, hydraulics) | Mid |
| Vendor A (example) | Heavy line pull | EN/CE | 8–12 wks | Medium | Mid–High |
| Vendor B (example) | Rugged coatings | ABS/DNV | 10–14 wks | Medium | High |
Options include groove pitch for specific rope constructions, drum width/diameter sets, hydro motors and valves, auto level-wind, load monitoring, and remote condition tracking. A North Sea platform retrofitted a 200 kN unit; rope change intervals moved from ~4 months to ~11 months, and planned downtime fell ≈30%. Not bad for a component most people never notice.
Citations