If you’re weighing up a double drum mooring winch for a refit or a newbuild, here’s the short version: the drum surface engineering matters as much as the motor on the nameplate. In fact, many customers say grooved sleeves are where rope life is won or lost. That’s been my experience on quay visits, too—fewer hockles, fewer rewinds, calmer crews.
Electrification (VFDs), condition monitoring, and OCIMF MEG4-aligned brake settings are now normal. The quieter revolution is LBS/Lebus-style groove sleeves. They’re retrofit-friendly and, surprisingly, they bridge the gap between steel wire and HMPE lines. On a double drum mooring winch, that translates into predictable spooling, fewer crushed wraps, steadier line tension.
| Parameter | Value (≈ real-world use may vary) |
|---|---|
| Rated pull | 100–300 kN @ 1st layer |
| Brake holding load | ≈1.25–1.5× rated (class-dependent; MEG4-aligned rendering) |
| Rope capacity | 600–1200 m (Ø44–56 mm wire or HMPE) |
| Drum style | Split double drum mooring winch, LBS helical-parallel groove sleeve |
| Drive | Electric VFD or hydraulic HPU |
| Speed | 0–15 m/min (25 m/min optional) |
| Materials | Q345B/S355 shell; 42CrMo sleeve; C5-M coating |
| Protection | IP56–IP66; ATEX/IECEx for tankers (optional) |
| Certifications | ABS/DNV/BV compliant; EN 10204 3.1 materials |
Bulkers, tankers, Ro-Ro ramps, offshore supply vessels—anywhere a double drum mooring winch handles mixed rope inventories. I’ve seen sleeves retrofitted pier-side in a day, which keeps superintendents happy and stevedores friendlier than usual.
| Vendor | Core strength | Groove solution | Lead time (≈) | Notes |
|---|---|---|---|---|
| LBS (Shijiazhuang, China) | Customized drum sleeves, retrofits | LBS/Lebus-style precision grooves | 4–8 weeks | Cost-effective; address: NO.688 Zhongshan Road, Qiaoxi district, Hebei |
| MacGregor | Turnkey mooring systems | Multiple options | 16–32 weeks | Premium integration |
| Kongsberg Maritime | High-spec electric winches | Grooved drum, split-drum | 20–30 weeks | Offshore-ready |
| DMT Marine Equipment | Value-focused portfolio | Lebus-type optional | 12–20 weeks | Flexible specs |
An operator swapped plain drums for LBS sleeves on a forward double drum mooring winch. After six months: rope life up ≈35%, reported mooring time down ≈12%, and zero slippage incidents in squalls. To be honest, the bosun just liked that the line “stayed where it should.”
Functional run at 1.1× rated pull; brake static test at ≈1.25× rated; spooling test with full drum; gearbox oil temp monitoring; noise survey. Results are logged to class witness where required.